Plaster Over Foam

Once I confirmed that trains ran flawlessly across the foam, I needed to address the foam gaps before I could affix the track and start with scenery. The solution, paper towels soaked in a thin Durabond 90 mixture. Once those had set I brushed on a thin layer of slightly thicker Durabond to smooth edges and add a bit more strength. Overall I’m happy with how it came out, hoping to get track glued this weekend.

img_4261.jpeg

img_4258.jpegimg_4257.jpeg